MAKING ROOM FOR GROWTH BEHIND THE SHOP
Chiappetta Shoes needed to make better use of the space in the back of their store while keeping the operation flexible for future growth. Tony shares how the Two3 team approached the project, worked through the details, and installed a shelf-supported mezzanine system that has continued to support the business years later.
Tony Chiappetta
CEO, Chiappetta Shoes
FROM BLANK CANVAS TO ACTIVE OPERATION
CED Sheboygan started with an empty 50,000 sq ft facility and product on the way. Charlie shares how Two3 helped bring the space together with racking, a closed-off counter area, and a modular office solution that supported a fast move from planning to install.
Charlie Monday
Profit Center Manager, CED Sheboygan
CLEAR COMMUNICATION FROM LAYOUT TO HANDOFF
Design Air worked with Two3 across multiple builds, where flexibility, communication, and real-time layout adjustments helped keep the process moving. Dan shares how the install team’s day-to-day professionalism and VR design tools made the project smoother from planning through completion.
Dan Fischer
Director of Operations, Design Air
MAXIMIZING STORAGE IN A TIGHT SPACE
In part 1 of this customer story, Alissa Currier from Waukesha Metal Products shares how their team needed to maximize storage in a tight warehouse space. What started as a 60-pallet plan became an 80-pallet solution after a re-measure, quick adjustments, and a pushback racking design that made better use of the available space.
Alissa Currier
Supply Chain Manager, Waukesha Metal Products
GETTING DETAILS RIGHT THE FIRST TIME
In part 2 of this customer story, Alissa Currier from Waukesha Metal Products talks about why the planning and install process mattered for their high-volume shipping operation. From multiple site checks to quick communication and careful measurements, Matt Yeisley and the Two3 team helped make sure the system was measured, double-checked, and installed the right way.
Alissa Currier
Supply Chain Manager, Waukesha Metal Products